Project: 8524 Wind based power generation by Panama Wind Energy Private Limited in Maharashtra, India - Request for post-registration changes
Project 8524 Wind based power generation by Panama Wind Energy Private Limited in Maharashtra, India
PRC ref PRC-8524-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 05 Dec 12 - 04 Dec 22
Assessment opinion Assessment opinion (449 KB)
Revised PDD Revised PDD (1236 KB)   Revised PDD - track changes (1279 KB)
Supplementary documents
Signed form
DOE clarification
VVS version VVS 9.0
Current status 04 Dec 15 - Approved
Effective approval date: 04 Dec 15
Historic statuses 05 Nov 15 - Request published