Project: 0045 Cuyamapa Hydroelectric Project - Request for post-registration changes
Project 0045 Cuyamapa Hydroelectric Project
PRC ref PRC-0045-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Sep 06 - 31 Aug 16
Assessment opinion Assessment opinion (118 KB)
Revised PDD Revised PDD (257 KB)   Revised PDD - track changes (237 KB)
Supplementary documents Appendix 1 - Cuyamapa 7th pro-rata analysis.xlsx (11 KB)
Appendix 2 - ERs calculation Rev PDD.xls (32 KB)
Signed form Signed form (164 KB)
DOE clarification
VVS version VVS 2.0
Current status 19 Jul 13 - Approved
Effective approval date: 19 Jul 13
Historic statuses 20 Jun 13 - Request published