17:09 03 Nov 25
Project:
6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia
- Request for post-registration changes
| Project | 6762 Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia |
|---|---|
| PRC ref | PRC-6762-002 |
| Process track | Issuance |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (571 KB)
|
| Revised PDD | |
| Supplementary documents | |
| Signed form |
Signed form (2653 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 08 Apr 21 -
Approved
Effective approval date: 08 Apr 21
|
| Historic statuses |
10 Mar 21 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: