16:57 07 Nov 25
Project:
8855 Solar Water Heater Program in India
- Request for post-registration changes
| Project | 8855 Solar Water Heater Program in India |
|---|---|
| PRC ref | PRC-8855-003 |
| Process track | Prior approval |
| DOE | Earthood |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 31 Dec 12 - 30 Dec 19 |
| Assessment opinion |
Assessment opinion (223 KB)
|
| Revised PDD |
Revised PDD (2466 KB)
Revised PDD - track changes (2290 KB)
|
| Supplementary documents |
Appendix 1 - 8855 Revised CER Calculation-CPA-02 to CPA-06 Public Version.zip (17 MB)
Appendix 2 - 8855 CEA database -for-publishing_clean-revised.xlsx (505 KB)
|
| Signed form |
Signed form (75 KB)
|
| DOE clarification | |
| VVS version | VVS-PoA 2.0 |
| Current status | 16 Dec 19 -
Approved
Effective approval date: 15 Dec 19
|
| Historic statuses |
11 Nov 19 -
Published 11 Nov 19 - Summary note being prepared 25 Nov 19 - Awaiting EB decision |

Assessment opinion
Revised PDD
Appendix 2 - 8855 CEA database -for-publishing_clean-revised.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: