Project: 1578 Uganda Nile Basin Reforestation Project No.3 - Request for post-registration changes
Project 1578 Uganda Nile Basin Reforestation Project No.3
PRC ref PRC-1578-002
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 06 Apr 2012 - 31 Dec 2017

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes specific to A/R project activities
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Apr 07 - 31 Mar 27
Assessment opinion Assessment opinion (720 KB)
Revised PDD Revised PDD (1371 KB)   Revised PDD - track changes (1205 KB)
Supplementary documents Appendix 1 - Uganda Nile Basin Reforestation Project No3_TARASM.xlsx (3568 KB)
Signed form Signed form (201 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 20 Oct 20 - Approved
Effective approval date: 20 Oct 20
Historic statuses 21 Sep 20 - Request published