Project: 4450 Grid connected renewable energy project in India - Request for post-registration changes
Project 4450 Grid connected renewable energy project in India
PRC ref PRC-4450-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 May 11 - 30 Apr 21
Assessment opinion Assessment opinion (746 KB)
Revised PDD Revised PDD (1852 KB)   Revised PDD - track changes (1899 KB)
Supplementary documents Appendix 1 - Registered PDD in VVS format.pdf (1261 KB)
Signed form Signed form (963 KB)
DOE clarification DOE clarification 1 - Response to the clarification_4450.pdf (27 KB)
VVS version VVS 2.0
Current status 13 Jun 14 - Approved
Effective approval date: 12 Jun 14
Historic statuses 25 Mar 14 - Published
08 Apr 14 - Awaiting DOE clarifications
22 Apr 14 - DOE clarifications received
22 Apr 14 - Summary note being prepared
22 May 14 - Awaiting EB decision