Project: 2639 VN08-WWS-04, Methane Recovery and Biogas Utilization Project, Lao Cai Province, Vietnam - Request for post-registration changes
Project 2639 VN08-WWS-04, Methane Recovery and Biogas Utilization Project, Lao Cai Province, Vietnam
PRC ref PRC-2639-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 20 Dec 10 - 19 Dec 17
Assessment opinion Assessment opinion (283 KB)
Revised PDD Revised PDD (1293 KB)   Revised PDD - track changes (1341 KB)
Supplementary documents Appendix 1 - ER Changes Spreadsheet.xlsx (30 KB)
Signed form Signed form (116 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 05 Jul 19 - Approved
Effective approval date: 05 Jul 19
Historic statuses 06 Jun 19 - Request published