07:21 01 Dec 24
Project:
10233 Biomass based power project of VPL
- Request for post-registration changes
Project | 10233 Biomass based power project of VPL |
---|---|
PRC ref | PRC-10233-001 |
Process track | Prior approval |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 14 Dec 15 - 13 Dec 25 |
Assessment opinion | Assessment opinion (240 KB) |
Revised PDD | Revised PDD (477 KB) Revised PDD - track changes (484 KB) |
Supplementary documents |
Appendix 1 - ER calculation VPL_PRC.xlsx (525 KB)
Appendix 2 - IRR Spreadsheet_PRC.xls (91 KB) |
Signed form | Signed form (44 KB) |
DOE clarification |
|
VVS version | VVS-PA 1.0 |
Current status | 16 Jan 18 -
Withdrawn
Effective approval date: 16 Jan 18
|
Historic statuses |
11 Dec 17 -
Published 11 Dec 17 - Summary note being prepared |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: