Project: 10233 Biomass based power project of VPL - Request for post-registration changes
Project 10233 Biomass based power project of VPL
PRC ref PRC-10233-001
Process track Prior approval
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 14 Dec 15 - 13 Dec 25
Assessment opinion Assessment opinion (240 KB)
Revised PDD Revised PDD (477 KB)   Revised PDD - track changes (484 KB)
Supplementary documents Appendix 1 - ER calculation VPL_PRC.xlsx (525 KB)
Appendix 2 - IRR Spreadsheet_PRC.xls (91 KB)
Signed form Signed form (44 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 16 Jan 18 - Withdrawn
Effective approval date: 16 Jan 18
Historic statuses 11 Dec 17 - Published
11 Dec 17 - Summary note being prepared