Project: 2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia - Request for post-registration changes
Project 2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia
PRC ref PRC-2185-002
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 02 Sep 2011 - 09 Nov 2011
Assessment opinion Assessment opinion (425 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (54 KB)
DOE clarification
VVS version VVS 2.0
Current status 08 Aug 14 - Approved
Effective approval date: 08 Aug 14
Historic statuses 10 Jul 14 - Request published