Project: 2648 Amine Circulation Pumps Energy Efficiency at Hazira works of ONGC - Request for post-registration changes
Project 2648 Amine Circulation Pumps Energy Efficiency at Hazira works of ONGC
PRC ref PRC-2648-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 23 Sep 09 - 22 Sep 19
Assessment opinion Assessment opinion (349 KB)
Revised PDD Revised PDD (664 KB)   Revised PDD - track changes (667 KB)
Supplementary documents
Signed form Signed form (1453 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Nov 13 - Approved
Effective approval date: 21 Nov 13
Historic statuses 23 Oct 13 - Request published