04:59 04 Jan 25
Project:
5992 Inner Mongolia China Water Group Huade Niujiafangzi Wind Farm 49.5MW Project
- Request for post-registration changes
Project | 5992 Inner Mongolia China Water Group Huade Niujiafangzi Wind Farm 49.5MW Project |
---|---|
PRC ref | PRC-5992-001 |
Process track | Issuance |
DOE | CTI Certification |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 11 Apr 12 - 10 Apr 22 |
Assessment opinion | Assessment opinion (157 KB) |
Revised PDD | Revised PDD (959 KB) Revised PDD - track changes (948 KB) |
Supplementary documents | |
Signed form | Signed form (524 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 21 Nov 14 -
Approved
Effective approval date: 21 Nov 14
|
Historic statuses |
23 Oct 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: