Project: 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa - Request for post-registration changes
Project 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa
PRC ref PRC-4728-004
Process track Prior approval
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Decrease in the capacity, Removal of a component or technology/measure
Applicable crediting period 01 Jul 11 - 30 Jun 18
Assessment opinion Assessment opinion (1158 KB)
Revised PDD Revised PDD (4746 KB)   Revised PDD - track changes (4904 KB)
Supplementary documents Appendix 1 - 2018-11-30 Beatrix CDM Financial Model_for MRIII v2.xls (723 KB)
Appendix 2 - 2021-02-22 Beatrix methane revised ex ante CER calcs.xlsx (418 KB)
Signed form Signed form (244 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 25 Nov 22 - Approved
Effective approval date: 24 Nov 22
Historic statuses 04 Oct 22 - Published
18 Oct 22 - Awaiting DOE clarifications
01 Nov 22 - DOE clarifications received
01 Nov 22 - Summary note being prepared
04 Nov 22 - Awaiting EB decision