Project: 10418 San Pedro Bio-Energy Project - Request for post-registration changes
Project 10418 San Pedro Bio-Energy Project
PRC ref PRC-10418-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 04 Jun 20 - 03 Jun 30
Assessment opinion Assessment opinion (181 KB)
Revised PDD Revised PDD (1550 KB)   Revised PDD - track changes (1605 KB)
Supplementary documents
Signed form Signed form (114 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 31 Oct 24 - Request published