Project:
10418 San Pedro Bio-Energy Project
- Request for post-registration changes
| Project | 10418 San Pedro Bio-Energy Project |
|---|---|
| PRC ref | PRC-10418-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 04 Jun 20 - 03 Jun 30 |
| Assessment opinion |
Assessment opinion (181 KB)
|
| Revised PDD |
Revised PDD (1550 KB)
Revised PDD - track changes (1605 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (114 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 24 Mar 25 -
Rejected
Effective rejection date: 21 Mar 25.
The reason for rejection can be viewed as part of the final ruling for the associated request for issuance.
|
| Historic statuses |
31 Oct 24 -
Request published |

Assessment opinion