23:15 14 Jan 25
Project:
7140 K-water hydropower VI
- Request for post-registration changes
Project | 7140 K-water hydropower VI |
---|---|
PRC ref | PRC-7140-001 |
Process track | Issuance |
DOE | KTR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Dec 12 - 30 Nov 22 |
Assessment opinion | Assessment opinion (2786 KB) |
Revised PDD | Revised PDD (1280 KB) Revised PDD - track changes (1377 KB) |
Supplementary documents | |
Signed form | Signed form (227 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 10 Aug 17 -
Approved
Effective approval date: 10 Aug 17
|
Historic statuses |
12 Jul 17 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: