Project: 2848 Bailongjiang Dalijie Hydropower Station - Request for post-registration changes
Project 2848 Bailongjiang Dalijie Hydropower Station
PRC ref PRC-2848-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 06 Dec 09 - 05 Dec 19
Assessment opinion Assessment opinion (145 KB)
Revised PDD Revised PDD (534 KB)   Revised PDD - track changes (536 KB)
Supplementary documents
Signed form Signed form (297 KB)
DOE clarification
VVS version VVS 2.0
Current status 15 Nov 12 - Approved
Effective approval date: 15 Nov 12
Historic statuses 17 Oct 12 - Request published