01:49 06 Dec 25
Project:
3558 Small-Scale Hydropower Project Sahanivotry in Madagascar
- Request for post-registration changes
| Project | 3558 Small-Scale Hydropower Project Sahanivotry in Madagascar |
|---|---|
| PRC ref | PRC-3558-001 |
| Process track | Prior approval |
| DOE | TÜV SÜD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 28 Aug 10 - 27 Aug 20 |
| Assessment opinion |
Assessment opinion (1833 KB)
|
| Revised PDD |
Revised PDD (2549 KB)
Revised PDD - track changes (2943 KB)
|
| Supplementary documents |
Appendix 1 - WACC calculation.xlsx (35 KB)
|
| Signed form |
Signed form (507 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 13 Nov 13 -
Approved
Effective approval date: 12 Nov 13
|
| Historic statuses |
08 Oct 13 -
Published 08 Oct 13 - Summary note being prepared 22 Oct 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - WACC calculation.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: