Project: 8414 Potrero Hydropower Plant, Peru - Request for post-registration changes
Project 8414 Potrero Hydropower Plant, Peru
PRC ref PRC-8414-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Jun 16 - 31 May 23
Assessment opinion Assessment opinion (788 KB)
Revised PDD Revised PDD (1436 KB)   Revised PDD - track changes (1496 KB)
Supplementary documents Appendix 1 - IRR calculation spreadsheet PRC - 10.09.2020.xlsx (225 KB)
Appendix 2 - Potrero PRC Estimated ER sheet 10.09.2020.xls (44 KB)
Signed form Signed form (7608 KB)
DOE clarification DOE clarification 1 - CCIPL767 PRC FVR-13.09.2020 clean.pdf (788 KB)
DOE clarification 2 - CCIPL767 PRC FVR-13.09.2020 track change.pdf (790 KB)
DOE clarification 3 - Potrero PRC PDD_UN8414_Clean _01112020.pdf (1436 KB)
DOE clarification 4 - Potrero PRC PDD_UN8414_Track Change _01112020.pdf (1496 KB)
VVS version VVS-PA 2.0
Current status 07 Dec 20 - Approved
Effective approval date: 06 Dec 20
Historic statuses 19 Oct 20 - Published
30 Oct 20 - Awaiting DOE clarifications
02 Nov 20 - DOE clarifications received
02 Nov 20 - Summary note being prepared
16 Nov 20 - Awaiting EB decision