20:16 28 Dec 24
Project:
8414 Potrero Hydropower Plant, Peru
- Request for post-registration changes
Project | 8414 Potrero Hydropower Plant, Peru |
---|---|
PRC ref | PRC-8414-001 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Jun 16 - 31 May 23 |
Assessment opinion | Assessment opinion (788 KB) |
Revised PDD | Revised PDD (1436 KB) Revised PDD - track changes (1496 KB) |
Supplementary documents |
Appendix 1 - IRR calculation spreadsheet PRC - 10.09.2020.xlsx (225 KB)
Appendix 2 - Potrero PRC Estimated ER sheet 10.09.2020.xls (44 KB) |
Signed form | Signed form (7608 KB) |
DOE clarification |
DOE clarification 1 - CCIPL767 PRC FVR-13.09.2020 clean.pdf (788 KB)
DOE clarification 2 - CCIPL767 PRC FVR-13.09.2020 track change.pdf (790 KB) DOE clarification 3 - Potrero PRC PDD_UN8414_Clean _01112020.pdf (1436 KB) DOE clarification 4 - Potrero PRC PDD_UN8414_Track Change _01112020.pdf (1496 KB) |
VVS version | VVS-PA 2.0 |
Current status | 07 Dec 20 -
Approved
Effective approval date: 06 Dec 20
|
Historic statuses |
19 Oct 20 -
Published 30 Oct 20 - Awaiting DOE clarifications 02 Nov 20 - DOE clarifications received 02 Nov 20 - Summary note being prepared 16 Nov 20 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: