Project: 2379 Kampot Cement Waste Heat Power Generation Project (KCC-WHG) - Request for post-registration changes
Project 2379 Kampot Cement Waste Heat Power Generation Project (KCC-WHG)
PRC ref PRC-2379-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jun 09 - 31 May 19
Assessment opinion Assessment opinion (370 KB)
Revised PDD Revised PDD (444 KB)   Revised PDD - track changes (692 KB)
Supplementary documents Appendix 1 - AQC & SP Boiler Specifications.pdf (151 KB)
Appendix 2 - Boiler Generator & Turbine Name Plates.pdf (2023 KB)
Signed form Signed form (53 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Apr 13 - Approved
Effective approval date: 26 Apr 13
Historic statuses 28 Mar 13 - Request published