Project: 0009 La Esperanza Hydroelectric Project - Request for post-registration changes
Project 0009 La Esperanza Hydroelectric Project
PRC ref PRC-0009-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jun 10 - 31 May 17
Assessment opinion Assessment opinion (521 KB)
Revised PDD Revised PDD (956 KB)   Revised PDD - track changes (711 KB)
Supplementary documents
Signed form Signed form (46 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Apr 14 - Approved
Effective approval date: 04 Apr 14
Historic statuses 06 Mar 14 - Request published