04:59 12 Nov 25
Project:
2971 Nam Gion Hydropower Project
- Request for post-registration changes
| Project | 2971 Nam Gion Hydropower Project |
|---|---|
| PRC ref | PRC-2971-002 |
| Process track | Prior approval |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 01 Sep 11 - 31 Aug 18 |
| Assessment opinion |
Assessment opinion (399 KB)
|
| Revised PDD |
Revised PDD (1404 KB)
Revised PDD - track changes (1405 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (244 KB)
|
| DOE clarification |
DOE clarification 1 - Response for the clarifications raised.pdf (83 KB)
DOE clarification 2 - Ref. 2971_Nam Gion HPP_PRC Revised PDD_Clean_Ver 5.2_20191114.pdf (1409 KB)
DOE clarification 3 - Ref. 2971_Nam Gion HPP_PRC Revised PDD_Track changes_Ver 5.2_20191114.pdf (1405 KB)
DOE clarification 4 - PRC report-14.11.2019.pdf (416 KB)
DOE clarification 5 - Post-registration changes form-15.11.2019.pdf (245 KB)
|
| VVS version | VVS-PA 2.0 |
| Current status | 27 Dec 19 -
Approved
Effective approval date: 19 Dec 19
|
| Historic statuses |
30 Oct 19 -
Published 13 Nov 19 - Awaiting DOE clarifications 15 Nov 19 - DOE clarifications received 15 Nov 19 - Summary note being prepared 29 Nov 19 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: