Project: 7093 Los Cocos Wind Farm Project - Request for post-registration changes
Project 7093 Los Cocos Wind Farm Project
PRC ref PRC-7093-003
Process track Issuance
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2018 - 31 Dec 2019
Assessment opinion Assessment opinion (598 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (241 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 19 Feb 24 - Approved
Effective approval date: 19 Feb 24
Historic statuses 19 Jan 24 - Request published