13:31 08 Nov 25
Project:
9570 Bundled wind power project Cape Verde
- Request for post-registration changes
| Project | 9570 Bundled wind power project Cape Verde |
|---|---|
| PRC ref | PRC-9570-003 |
| Process track | Issuance |
| DOE | RINA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 01 Apr 20 - 31 Mar 27 |
| Assessment opinion |
Assessment opinion (434 KB)
|
| Revised PDD |
Revised PDD (1303 KB)
Revised PDD - track changes (1309 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (131 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 06 Feb 23 - Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: