Project: 9226 Jirau Hydro Power Plant - Request for post-registration changes
Project 9226 Jirau Hydro Power Plant
PRC ref PRC-9226-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jul 14 - 30 Jun 21
Assessment opinion Assessment opinion (517 KB)
Revised PDD Revised PDD (2029 KB)   Revised PDD - track changes (2206 KB)
Supplementary documents
Signed form Signed form (98 KB)
DOE clarification
VVS version VVS 9.0
Current status 26 Aug 16 - Approved
Effective approval date: 26 Aug 16
Historic statuses 28 Jul 16 - Request published