16:53 07 Jan 25
Project:
5247 Sichuan Province Dayan River 4th Level Hydropower Project
- Request for post-registration changes
Project | 5247 Sichuan Province Dayan River 4th Level Hydropower Project |
---|---|
PRC ref | PRC-5247-001 |
Process track | Issuance |
DOE | JCI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Dec 11 - 30 Nov 18 |
Assessment opinion | Assessment opinion (1144 KB) |
Revised PDD | Revised PDD (568 KB) Revised PDD - track changes (568 KB) |
Supplementary documents | |
Signed form | Signed form (153 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 16 May 13 -
Approved
Effective approval date: 16 May 13
|
Historic statuses |
16 Apr 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: