Project:
0258 Nueva Aldea Biomass Power Plant Phase 1
- Request for post-registration changes
Project | 0258 Nueva Aldea Biomass Power Plant Phase 1 |
---|---|
PRC ref | PRC-0258-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jan 12 - 31 Dec 18 |
Assessment opinion | Assessment opinion (2113 KB) |
Revised PDD | Revised PDD (2700 KB) Revised PDD - track changes (2660 KB) |
Supplementary documents |
Appendix 1 - 1.4. 0258-CERS-11-12 ver1.zip (105 KB)
|
Signed form | Signed form (50 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 31 Aug 15 -
Approved
Effective approval date: 31 Aug 15
|
Historic statuses |
31 Jul 15 -
Request published |