Project:
0258 Nueva Aldea Biomass Power Plant Phase 1
- Request for post-registration changes
| Project | 0258 Nueva Aldea Biomass Power Plant Phase 1 |
|---|---|
| PRC ref | PRC-0258-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Jan 12 - 31 Dec 18 |
| Assessment opinion |
Assessment opinion (2113 KB)
|
| Revised PDD |
Revised PDD (2700 KB)
Revised PDD - track changes (2660 KB)
|
| Supplementary documents |
Appendix 1 - 1.4. 0258-CERS-11-12 ver1.zip (105 KB)
|
| Signed form |
Signed form (50 KB)
|
| DOE clarification | |
| VVS version | VVS 7.0 |
| Current status | 31 Aug 15 -
Approved
Effective approval date: 31 Aug 15
|
| Historic statuses |
31 Jul 15 -
Request published |

Assessment opinion