Project: 1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited - Request for post-registration changes
Project 1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited
PRC ref PRC-1220-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 14 Dec 2007 - 31 Dec 2012

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 14 Dec 07 - 13 Dec 17
Assessment opinion Assessment opinion (1511 KB)
Revised PDD Revised PDD (1108 KB)   Revised PDD - track changes (1136 KB)
Supplementary documents
Signed form Signed form (51 KB)
DOE clarification DOE clarification 1 - 1220-Separate Response to Clarifications raised.pdf (237 KB)
DOE clarification 2 - Enclosure 1.xls (89 KB)

VVS version VVS 2.0
Current status 01 Jul 13 - Approved
Effective approval date: 13 Jun 13
Historic statuses 20 Nov 12 - Published
09 Apr 13 - Awaiting DOE clarifications
23 Apr 13 - DOE clarifications received
23 Apr 13 - Summary note being prepared
23 May 13 - Awaiting EB decision