Project:
1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited
- Request for post-registration changes
| Project | 1220 Flare gas recovery project at Uran plant, Oil and Natural Gas Corporation (ONGC) Limited |
|---|---|
| PRC ref | PRC-1220-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 14 Dec 07 - 13 Dec 17 |
| Assessment opinion |
Assessment opinion (1511 KB)
|
| Revised PDD |
Revised PDD (1108 KB)
Revised PDD - track changes (1136 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (51 KB)
|
| DOE clarification |
DOE clarification 1 - 1220-Separate Response to Clarifications raised.pdf (237 KB)
DOE clarification 2 - Enclosure 1.xls (89 KB)
|
| VVS version | VVS 2.0 |
| Current status | 01 Jul 13 -
Approved
Effective approval date: 13 Jun 13
|
| Historic statuses |
20 Nov 12 -
Published 09 Apr 13 - Awaiting DOE clarifications 23 Apr 13 - DOE clarifications received 23 Apr 13 - Summary note being prepared 23 May 13 - Awaiting EB decision |

Assessment opinion
DOE clarification 2 - Enclosure 1.xls