Project: 5619 Modelo del Callao Landfill Gas Capture and Flaring System - Request for post-registration changes
Project 5619 Modelo del Callao Landfill Gas Capture and Flaring System
PRC ref PRC-5619-002
Process track Renewal
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list ACM0001 ver. 19 - Flaring or use of landfill gas
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:
Applicable crediting period 20 Aug 19 - 19 Aug 26
Assessment opinion Assessment opinion (258 KB)
Revised PDD   Revised PDD - track changes (2115 KB)
Supplementary documents
Signed form Signed form (156 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 31 Dec 20 - Approved
Effective approval date: 31 Dec 20
Historic statuses 02 Dec 20 - Request published