Project: 0156 CECECAPA Small Hydroelectric Project - Request for post-registration changes
Project 0156 CECECAPA Small Hydroelectric Project
PRC ref PRC-0156-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Dec 05 - 30 Nov 15
Assessment opinion Assessment opinion (1832 KB)
Revised PDD Revised PDD (1319 KB)   Revised PDD - track changes (1351 KB)
Supplementary documents Appendix 1 - Letter from Manufacturer WKV.pdf (385 KB)
Appendix 2 - Warranty quality of turbines with translation.pdf (524 KB)
Signed form Signed form (974 KB)
DOE clarification
VVS version VVS 2.0
Current status 14 Jun 13 - Approved
Effective approval date: 14 Jun 13
Historic statuses 16 May 13 - Request published