10:49 28 Dec 24
Project:
0393 El Gallo Hydroelectric Project.
- Request for post-registration changes
Project | 0393 El Gallo Hydroelectric Project. |
---|---|
PRC ref | PRC-0393-001 |
Process track | Prior approval |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Dec 06 - 30 Nov 13 |
Assessment opinion | Assessment opinion (506 KB) |
Revised PDD | Revised PDD (927 KB) Revised PDD - track changes (976 KB) |
Supplementary documents | |
Signed form | Signed form (139 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 23 Jan 13 -
Approved
Effective approval date: 22 Jan 13
|
Historic statuses |
29 Nov 12 -
Published 29 Nov 12 - Summary note being prepared 01 Jan 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: