Project: 0393 El Gallo Hydroelectric Project. - Request for post-registration changes
Project 0393 El Gallo Hydroelectric Project.
PRC ref PRC-0393-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Dec 06 - 30 Nov 13
Assessment opinion Assessment opinion (506 KB)
Revised PDD Revised PDD (927 KB)   Revised PDD - track changes (976 KB)
Supplementary documents
Signed form Signed form (139 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 Jan 13 - Approved
Effective approval date: 22 Jan 13
Historic statuses 29 Nov 12 - Published
29 Nov 12 - Summary note being prepared
01 Jan 13 - Awaiting EB decision