Project: 5401 Installation of wind power project in Rajasthan and Tamil Nadu - Request for post-registration changes
Project 5401 Installation of wind power project in Rajasthan and Tamil Nadu
PRC ref PRC-5401-002
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Jan 12 - 09 Jan 22
Assessment opinion Assessment opinion (428 KB)
Revised PDD Revised PDD (682 KB)   Revised PDD - track changes (764 KB)
Supplementary documents
Signed form Signed form (296 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 Jan 17 - Approved
Effective approval date: 23 Jan 17
Historic statuses 23 Dec 16 - Request published