Project: 8890 Bundled Wind Power Project by Peethambra Granites Pvt Ltd (EKIESL-CDM. November -11-01) - Request for post-registration changes
Project 8890 Bundled Wind Power Project by Peethambra Granites Pvt Ltd (EKIESL-CDM. November -11-01)
PRC ref PRC-8890-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 19 Dec 12 - 18 Dec 19
Assessment opinion Assessment opinion (164 KB)
Revised PDD Revised PDD (357 KB)   Revised PDD - track changes (358 KB)
Supplementary documents
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 23 Jul 18 - Approved
Effective approval date: 23 Jul 18
Historic statuses 22 Jun 18 - Request published