23:49 26 Jan 25
Project:
0249 Biomass Energy Plant-Lumut.
- Request for post-registration changes
Project | 0249 Biomass Energy Plant-Lumut. |
---|---|
PRC ref | PRC-0249-001 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Feb 05 - 31 Jan 12 |
Assessment opinion | Assessment opinion (249 KB) |
Revised PDD | Revised PDD (733 KB) Revised PDD - track changes (777 KB) |
Supplementary documents |
Appendix 1 - PGEO Emission Reduction Calculations (before & after).xls (42 KB)
|
Signed form | Signed form (169 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 31 Aug 12 -
Approved
Effective approval date: 31 Aug 12
|
Historic statuses |
31 Jul 12 -
Published 31 Jul 12 - Summary note being prepared 10 Aug 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: