Project: 1644 NRL -Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam - Request for post-registration changes
Project 1644 NRL -Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam
PRC ref PRC-1644-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 25 Nov 09 - 24 Nov 19
Assessment opinion Assessment opinion (291 KB)
Revised PDD Revised PDD (647 KB)   Revised PDD - track changes (689 KB)
Supplementary documents Appendix 1 - Approved PDD (Version 4) in VVS mode.pdf (632 KB)
Signed form Signed form (114 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Sep 13 - Approved
Effective approval date: 25 Sep 13
Historic statuses 21 Aug 13 - Published
21 Aug 13 - Summary note being prepared
04 Sep 13 - Awaiting EB decision