01:16 11 Jan 25
Project:
1644 NRL -Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam
- Request for post-registration changes
Project | 1644 NRL -Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam |
---|---|
PRC ref | PRC-1644-001 |
Process track | Prior approval |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 25 Nov 09 - 24 Nov 19 |
Assessment opinion | Assessment opinion (291 KB) |
Revised PDD | Revised PDD (647 KB) Revised PDD - track changes (689 KB) |
Supplementary documents |
Appendix 1 - Approved PDD (Version 4) in VVS mode.pdf (632 KB)
|
Signed form | Signed form (114 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 25 Sep 13 -
Approved
Effective approval date: 25 Sep 13
|
Historic statuses |
21 Aug 13 -
Published 21 Aug 13 - Summary note being prepared 04 Sep 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: