Project: 3333 Samsung Electronics SF6 abatement project - Request for post-registration changes
Project 3333 Samsung Electronics SF6 abatement project
PRC ref PRC-3333-001
Process track Prior approval
DOE KTR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 21 Oct 10 - 20 Oct 20
Assessment opinion Assessment opinion (202 KB)
Revised PDD Revised PDD (1022 KB)   Revised PDD - track changes (1259 KB)
Supplementary documents
Signed form Signed form (237 KB)
DOE clarification DOE clarification 1 - Clarification_letter0427.pdf (44 KB)
DOE clarification 2 - revised_Vidation_report_of_PRC_ver3.0.pdf (208 KB)
DOE clarification 3 - 삼성_SF6_PDD_Clean_changed.pdf (1017 KB)
DOE clarification 4 - 삼성_SF6_PDD_Track_changed.pdf (1021 KB)
DOE clarification 5 - 2nd Clarification letter.pdf (60 KB)
DOE clarification 6 - Letter from KRISS.pdf (286 KB)
DOE clarification 7 - Letter from EL.pdf (98 KB)
DOE clarification 8 - Annex 1.c. Quantification by using library in FTIR.pdf (58 KB)
DOE clarification 9 - Report of Analysis for SiF4.pdf (453 KB)
DOE clarification 10 - PDD_3333_tracking ver09.pdf (1023 KB)
DOE clarification 11 - PDD_3333_Clean ver09.pdf (1023 KB)
DOE clarification 12 - Validation of Post registration Change ver.5.0.pdf (215 KB)
DOE clarification 13 - 13_ PDD_Track change ver 10.pdf (1024 KB)
DOE clarification 14 - 14_PDD_Clean ver 10.pdf (1017 KB)
VVS version VVS 7.0
Current status 28 Jul 15 - Approved
Effective approval date: 28 Jul 15
Historic statuses 07 Apr 15 - Published
11 May 15 - Awaiting DOE clarifications
25 May 15 - DOE clarifications received
03 Jul 15 - Summary note being prepared
07 Jul 15 - Awaiting EB decision