Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jan 15 - 31 Dec 21 |
Assessment opinion | Assessment opinion (453 KB) |
Revised PDD | Revised PDD (806 KB) Revised PDD - track changes (809 KB) |
Supplementary documents | |
Signed form | Signed form (152 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 27 Dec 22 -
Approved
Effective approval date: 27 Dec 22
|
Historic statuses |