Project: 10150 Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Rajasthan - Request for post-registration changes
Project 10150 Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Rajasthan
PRC ref PRC-10150-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Jan 16 - 31 Dec 22
Assessment opinion Assessment opinion (379 KB)
Revised PDD Revised PDD (1392 KB)   Revised PDD - track changes (1460 KB)
Supplementary documents
Signed form Signed form (256 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 09 Feb 23 - Approved
Effective approval date: 09 Feb 23
Historic statuses 11 Jan 23 - Request published