Project: 3443 Liaoning Xingcheng Liutaizi Wind Farm Project - Request for post-registration changes
Project 3443 Liaoning Xingcheng Liutaizi Wind Farm Project
PRC ref PRC-3443-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 18 Oct 10 - 17 Oct 17
Assessment opinion Assessment opinion (599 KB)
Revised PDD Revised PDD (1228 KB)   Revised PDD - track changes (1231 KB)
Supplementary documents
Signed form Signed form (57 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Mar 13 - Approved
Effective approval date: 21 Mar 13
Historic statuses 20 Feb 13 - Request published