Project: 6397 Ha Tay Hydropower Project - Request for post-registration changes
Project 6397 Ha Tay Hydropower Project
PRC ref PRC-6397-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Sep 14 - 31 Aug 21
Assessment opinion Assessment opinion (571 KB)
Revised PDD Revised PDD (1125 KB)   Revised PDD - track changes (1153 KB)
Supplementary documents
Signed form Signed form (1542 KB)
DOE clarification
VVS version VVS 9.0
Current status 13 Jul 16 - Approved
Effective approval date: 11 Jul 16
Historic statuses 14 Jun 16 - Published
14 Jun 16 - Summary note being prepared
21 Jun 16 - Awaiting EB decision