Project: 0275 Santa Ana Hydroelectric Plant - Request for post-registration changes
Project 0275 Santa Ana Hydroelectric Plant
PRC ref PRC-0275-001
Process track Issuance
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Aug 05 - 31 Jul 15
Assessment opinion Assessment opinion (260 KB)
Revised PDD Revised PDD (2584 KB)   Revised PDD - track changes (2620 KB)
Supplementary documents
Signed form Signed form (988 KB)
DOE clarification
VVS version VVS 2.0
Current status 14 Apr 14 - Approved
Effective approval date: 14 Apr 14
Historic statuses 14 Mar 14 - Request published