Project: 5619 Modelo del Callao Landfill Gas Capture and Flaring System - Request for post-registration changes
Project 5619 Modelo del Callao Landfill Gas Capture and Flaring System
PRC ref PRC-5619-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 20 Aug 12 - 19 Aug 19
Assessment opinion Assessment opinion (610 KB)
Revised PDD Revised PDD (1963 KB)   Revised PDD - track changes (2081 KB)
Supplementary documents
Signed form Signed form (116 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Aug 15 - Approved
Effective approval date: 19 Aug 15
Historic statuses 21 Jul 15 - Published
21 Jul 15 - Summary note being prepared
29 Jul 15 - Awaiting EB decision