06:17 06 Jan 25
Project:
5619 Modelo del Callao Landfill Gas Capture and Flaring System
- Request for post-registration changes
Project | 5619 Modelo del Callao Landfill Gas Capture and Flaring System |
---|---|
PRC ref | PRC-5619-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 20 Aug 12 - 19 Aug 19 |
Assessment opinion | Assessment opinion (610 KB) |
Revised PDD | Revised PDD (1963 KB) Revised PDD - track changes (2081 KB) |
Supplementary documents | |
Signed form | Signed form (116 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 21 Aug 15 -
Approved
Effective approval date: 19 Aug 15
|
Historic statuses |
21 Jul 15 -
Published 21 Jul 15 - Summary note being prepared 29 Jul 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: