23:29 25 Jan 25
Project:
0032 Methane capture and combustion from swine manure treatment for Peralillo
- Request for post-registration changes
Project | 0032 Methane capture and combustion from swine manure treatment for Peralillo |
---|---|
PRC ref | PRC-0032-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
Applicable crediting period | 01 Jan 08 - 31 Dec 14 |
Assessment opinion | Assessment opinion (1881 KB) |
Revised PDD | Revised PDD (714 KB) Revised PDD - track changes (748 KB) |
Supplementary documents |
Appendix 1 - 192a PDD Peralillo sin cambios.pdf (627 KB)
Appendix 2 - Upload Information for Documents.pdf (106 KB) |
Signed form | Signed form (96 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 30 Dec 13 -
Approved
Effective approval date: 30 Dec 13
|
Historic statuses |
28 Nov 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: