Project: 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa - Request for post-registration changes
Project 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
PRC ref PRC-9007-002
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, A revision to the eligibility criteria pertaining to the demonstration of additionality
Applicable crediting period 25 Apr 13 - 24 Apr 20
Assessment opinion Assessment opinion (1145 KB)
Revised PDD Revised PDD (1085 KB)   Revised PDD - track changes (1298 KB)
Supplementary documents Appendix 1 - 9007 CPA 1 ER sheet.xls (163 KB)
Signed form Signed form (1201 KB)
DOE clarification DOE clarification 1 - 9007 CPA 1 ver 12.2 Clean.pdf (1117 KB)
DOE clarification 2 - 9007 CPA 1 ver 12.2 TC.PDF (1202 KB)
DOE clarification 3 - CCIPL 590-CPA PRC FVR_ver04.1-clean.pdf (1150 KB)
DOE clarification 4 - CCIPL 590-CPA PRC FVR_ver04.1-TC.pdf (1152 KB)
DOE clarification 5 - 9007 CPA 1 ER sheet.xls (159 KB)
VVS version VVS-PoA 1.0
Current status 26 Sep 18 - Approved
Effective approval date: 25 Sep 18
Historic statuses 30 Jul 18 - Published
13 Aug 18 - Awaiting DOE clarifications
23 Aug 18 - DOE clarifications received
23 Aug 18 - Summary note being prepared
05 Sep 18 - Awaiting EB decision