Project: 2637 AVN08-S-02, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam - Request for post-registration changes
Project 2637 AVN08-S-02, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam
PRC ref PRC-2637-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 12 Oct 10 - 11 Oct 17
Assessment opinion Assessment opinion (162 KB)
Revised PDD Revised PDD (920 KB)   Revised PDD - track changes (915 KB)
Supplementary documents
Signed form Signed form (169 KB)
DOE clarification DOE clarification 1 - AVN08-S-02-ver 11-clean.pdf (891 KB)
DOE clarification 2 - AVN08-S-02-ver 11-track-from PRC to request of clarification.pdf (982 KB)
DOE clarification 3 - 2nd clarification. 8_PRC_VEAM 2637_PRC_Rev 2_Clean.pdf (159 KB)
DOE clarification 4 - 2nd clarification. 8_PRC_VEAM 2637_PRC_Rev 2.pdf (191 KB)
DOE clarification 5 - 2nd clarification. AVN08-S-02-ver 12-clean.pdf (685 KB)
DOE clarification 6 - 2nd clarification. AVN08-S-02-ver 12-track-from PDD to request of clarification.pdf (957 KB)
DOE clarification 7 - 2nd clarification. AVN08-S-02-ver 12-track-from PRC to request of clarification.pdf (998 KB)
VVS version VVS 2.0
Current status 01 Nov 13 - Rejected
Effective rejection date: 30 Oct 13. Reason (415 KB)
Historic statuses 10 Jul 13 - Published
30 Jul 13 - Awaiting DOE clarifications
13 Aug 13 - DOE clarifications received
09 Oct 13 - Summary note being prepared
09 Oct 13 - Awaiting EB decision