Project: 4302 SASSA Low Pressure Solar Water Heater Programme - Request for post-registration changes
Project 4302 SASSA Low Pressure Solar Water Heater Programme
PRC ref PRC-4302-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 12 Mar 11 - 11 Mar 18
Assessment opinion Assessment opinion (219 KB)
Revised PDD Revised PDD (577 KB)   Revised PDD - track changes (442 KB)
Supplementary documents Appendix 1 - PDD_form15_2013 06 03.pdf (778 KB)
Signed form Signed form (256 KB)
DOE clarification
VVS version VVS 3.0
Current status 15 Nov 13 - Approved
Effective approval date: 13 Nov 13
Historic statuses 09 Oct 13 - Published
09 Oct 13 - Summary note being prepared
23 Oct 13 - Awaiting EB decision