16:31 23 Jan 25
Project:
4302 SASSA Low Pressure Solar Water Heater Programme
- Request for post-registration changes
Project | 4302 SASSA Low Pressure Solar Water Heater Programme |
---|---|
PRC ref | PRC-4302-001 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 12 Mar 11 - 11 Mar 18 |
Assessment opinion | Assessment opinion (219 KB) |
Revised PDD | Revised PDD (577 KB) Revised PDD - track changes (442 KB) |
Supplementary documents |
Appendix 1 - PDD_form15_2013 06 03.pdf (778 KB)
|
Signed form | Signed form (256 KB) |
DOE clarification | |
VVS version | VVS 3.0 |
Current status | 15 Nov 13 -
Approved
Effective approval date: 13 Nov 13
|
Historic statuses |
09 Oct 13 -
Published 09 Oct 13 - Summary note being prepared 23 Oct 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: