02:52 09 Nov 24
Project:
4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW
- Request for post-registration changes
Project | 4118 Asahan 1 Hydroelectric Power Plant 2 x 90 MW |
---|---|
PRC ref | PRC-4118-002 |
Process track | Issuance |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 Mar 11 - 28 Feb 18 |
Assessment opinion | Assessment opinion (198 KB) |
Revised PDD | Revised PDD (1125 KB) Revised PDD - track changes (2094 KB) |
Supplementary documents | |
Signed form | Signed form (158 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 10 Feb 15 -
Approved
Effective approval date: 10 Feb 15
|
Historic statuses |
12 Jan 15 -
Request published |