Project:
10543 10MW solar PV based power generation by Helios Beau Champ Limited in Mauritius
- Request for post-registration changes
Project | 10543 10MW solar PV based power generation by Helios Beau Champ Limited in Mauritius |
---|---|
PRC ref | PRC-10543-001 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
Applicable crediting period | 30 Nov 19 - 29 Nov 26 |
Assessment opinion | Assessment opinion (279 KB) |
Revised PDD | Revised PDD (519 KB) Revised PDD - track changes (1094 KB) |
Supplementary documents | |
Signed form | Signed form (152 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 27 Jul 21 -
Approved
Effective approval date: 27 Jul 21
|
Historic statuses |
28 Jun 21 -
Request published |