15:21 14 Nov 25
Project:
1066 Tres Valles Cogeneration Project
- Request for post-registration changes
| Project | 1066 Tres Valles Cogeneration Project |
|---|---|
| PRC ref | PRC-1066-001 |
| Process track | Prior approval |
| DOE | ICONTEC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Jan 04 - 31 Dec 10 |
| Assessment opinion |
Assessment opinion (163 KB)
|
| Revised PDD |
Revised PDD (732 KB)
Revised PDD - track changes (830 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (135 KB)
|
| DOE clarification |
DOE clarification 1 - Tres Valles 2013.zip (1958 KB)
|
| VVS version | VVS 2.0 |
| Current status | 06 Nov 13 -
Rejected
Effective rejection date: 29 Oct 13.
Reason (29 KB)
|
| Historic statuses |
06 Aug 13 -
Published 02 Sep 13 - Awaiting DOE clarifications 23 Sep 13 - DOE clarifications received 23 Sep 13 - Summary note being prepared 08 Oct 13 - Awaiting EB decision |

Assessment opinion
DOE clarification 1 - Tres Valles 2013.zip
Reason
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: