Project: 1066 Tres Valles Cogeneration Project - Request for post-registration changes
Project 1066 Tres Valles Cogeneration Project
PRC ref PRC-1066-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Jan 04 - 31 Dec 10
Assessment opinion Assessment opinion (163 KB)
Revised PDD Revised PDD (732 KB)   Revised PDD - track changes (830 KB)
Supplementary documents
Signed form Signed form (135 KB)
DOE clarification DOE clarification 1 - Tres Valles 2013.zip (1958 KB)
VVS version VVS 2.0
Current status 06 Nov 13 - Rejected
Effective rejection date: 29 Oct 13. Reason (29 KB)
Historic statuses 06 Aug 13 - Published
02 Sep 13 - Awaiting DOE clarifications
23 Sep 13 - DOE clarifications received
23 Sep 13 - Summary note being prepared
08 Oct 13 - Awaiting EB decision