Project: 2266 8.5 MW Wind Energy Project by KS Oils Limited, India - Request for post-registration changes
Project 2266 8.5 MW Wind Energy Project by KS Oils Limited, India
PRC ref PRC-2266-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 07 Apr 09 - 06 Apr 19
Assessment opinion Assessment opinion (49 KB)
Revised PDD Revised PDD (555 KB)   Revised PDD - track changes (540 KB)
Supplementary documents Appendix 1 - ANNEX-I_Order for implementation ABT_Meter.pdf (210 KB)
Appendix 2 - ANNEX-II_Share certificate March'10_using transformer meter.pdf (745 KB)
Appendix 3 - ANNEX-III_Share certificate April'10_using ABT meter.pdf (894 KB)
Appendix 4 - ANNEX-IV_Calibration frequency of ABT Meter.pdf (348 KB)
Signed form Signed form (177 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Dec 12 - Approved
Effective approval date: 07 Dec 12