15:23 25 Jan 25
Project:
2266 8.5 MW Wind Energy Project by KS Oils Limited, India
- Request for post-registration changes
Project | 2266 8.5 MW Wind Energy Project by KS Oils Limited, India |
---|---|
PRC ref | PRC-2266-001 |
Process track | Issuance |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 07 Apr 09 - 06 Apr 19 |
Assessment opinion | Assessment opinion (49 KB) |
Revised PDD | Revised PDD (555 KB) Revised PDD - track changes (540 KB) |
Supplementary documents |
Appendix 1 - ANNEX-I_Order for implementation ABT_Meter.pdf (210 KB)
Appendix 2 - ANNEX-II_Share certificate March'10_using transformer meter.pdf (745 KB) Appendix 3 - ANNEX-III_Share certificate April'10_using ABT meter.pdf (894 KB) Appendix 4 - ANNEX-IV_Calibration frequency of ABT Meter.pdf (348 KB) |
Signed form | Signed form (177 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 07 Dec 12 -
Approved
Effective approval date: 07 Dec 12
|
Historic statuses |
08 Nov 12 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: