Project:
3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China
- Request for post-registration changes
Project | 3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China |
---|---|
PRC ref | PRC-3776-001 |
Process track | Prior approval |
DOE | JQA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 03 Mar 11 - 02 Mar 21 |
Assessment opinion | Assessment opinion (285 KB) |
Revised PDD | Revised PDD (702 KB) Revised PDD - track changes (1379 KB) |
Supplementary documents |
Appendix 1 - IRR.xls (131 KB)
|
Signed form | Signed form (143 KB) |
DOE clarification |
DOE clarification 1 - Clarification_PRC-3776-001.pdf (461 KB)
|
VVS version | VVS 2.0 |
Current status | 27 Dec 12 -
Approved
Effective approval date: 27 Dec 12
|
Historic statuses |
30 Oct 12 -
Published 13 Nov 12 - Awaiting DOE clarifications 22 Nov 12 - DOE clarifications received 22 Nov 12 - Summary note being prepared 06 Dec 12 - Awaiting EB decision |