20:06 28 Oct 25
Project:
3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China
- Request for post-registration changes
| Project | 3776 Low Pressure Gas Recovery Project of Shandong Changyi Petrochemical Co., Ltd., China |
|---|---|
| PRC ref | PRC-3776-001 |
| Process track | Prior approval |
| DOE | JQA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 03 Mar 11 - 02 Mar 21 |
| Assessment opinion |
Assessment opinion (285 KB)
|
| Revised PDD |
Revised PDD (702 KB)
Revised PDD - track changes (1379 KB)
|
| Supplementary documents |
Appendix 1 - IRR.xls (131 KB)
|
| Signed form |
Signed form (143 KB)
|
| DOE clarification |
DOE clarification 1 - Clarification_PRC-3776-001.pdf (461 KB)
|
| VVS version | VVS 2.0 |
| Current status | 27 Dec 12 -
Approved
Effective approval date: 27 Dec 12
|
| Historic statuses |
30 Oct 12 -
Published 13 Nov 12 - Awaiting DOE clarifications 22 Nov 12 - DOE clarifications received 22 Nov 12 - Summary note being prepared 06 Dec 12 - Awaiting EB decision |

Assessment opinion
Revised PDD - track changes
Appendix 1 - IRR.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: