13:47 08 Nov 25
Project:
2383 Jiangsu Wangting Natural Gas Based Power Generation Project
- Request for post-registration changes
| Project | 2383 Jiangsu Wangting Natural Gas Based Power Generation Project |
|---|---|
| PRC ref | PRC-2383-001 |
| Process track | Issuance |
| DOE | DNV |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 09 Nov 09 - 08 Nov 16 |
| Assessment opinion |
Assessment opinion (149 KB)
|
| Revised PDD |
Revised PDD (672 KB)
Revised PDD - track changes (681 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (174 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 02 Nov 12 -
Approved
Effective approval date: 02 Nov 12
|
| Historic statuses |
04 Oct 12 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: